Hunt Chat  

Go Back   Hunt Chat > All Things HC > Almost Anything Goes

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #23  
Old 08-13-2010, 12:12 PM
Larryjk Larryjk is offline
Registered User
 
Join Date: Jan 2008
Location: Rawlins, WY
Posts: 824
Fabsroman, Where did you get the information that Halliburton installed the BOP stack? At least on "on-shore" operations, this is a duty of the drilling rig operator, in accordance with the APD (Application for Permit to Drill). On those operations Halliburton wouldn't have anything to do with casing operations, other than cementing. That is far removed from the BOP installation, which would be the first order of business after surface conductor installation.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:00 AM.


Powered by vBulletin® Version
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.